Select a year to view completed projects
End User: Hecotech Pte Ltd/Brunei Shell
Date: July 2026 – Dec 2026
Supply of PA Upgrade to AMPA 6.
End User: Brooke Holding Sdn Bhd
Date: July 2026 – Dec 2026
Supply, Delivery & Documentation of Fire & Gas Devices Honeywell and associated MEDC and Tyco for Sirung Production Platform (PP).
End User: Searah (Malaysia) Sdn. Bhd
Date: July 2026 – Jun 2030
Provision of vendor site support services for Tyco Minerva FGSA & Honeywell Gas Detectors at PCSB offshore and onshore locations.
End User: MLNG
Date: May 2026 – May 2028
Maintenance & servicing of Fire & Gas Detection System (FGDS) in Petronas LNG complex.
End User: Petronas Carigali Sdn Bhd
Date: May 2026 – November 2026
To supply Fire and Gas Detectors, Junction Boxes and to provide site services (Installation and Commissioning) for BIF Sigma 2.0.
End User: OceanMight Sdn Bhd
Date: March 2026 – July 2026
Supply, Delivery & Documentation of Fire & Gas Devices Honeywell and associated MEDC, Hawke, MALGAZ, and Mircopack at BLS.
End User: OceanMight Sdn Bhd
Date: March 2026 – July 2026
Systems Involved Thermal imaging detector and training for Honeywell and MEDC for theory training and commissioning and SAT.
End User: OceanMight Sdn Bhd
Date: March 2026 – July 2026
Supply, Delivery & Documentation of Fire & Gas Devices Honeywell and associated MEDC, Hawke, MALGAZ, and Mircopack at Belud South.
End User: Regas Terminal (Sg. Udang) Sdn Bhd
Date: March 2026 – March 2031
Term contract for Services Support and Maintenance for Gaitronics Public Address & General Alarm (PAGA) sytem and associated equipment at RGTSU & RGTP for a period of five (5) years.
End User: Hibiscus Oil & Gas Malaysia Limited
Date: March 2026 – March 2029
Provision of Gai-Tronics PAGA Parts and Services for PM3.
End User: MLNG
Date: March 2026 – August 2029
Price Agreement for Supply and Delivery of Honeywell Sieger Products for MLNG.
End User: EnQuest Petroleum Production Malaysia Ltd/Petronas
Date: March 2026 – August 2026
Supply of PA communication System Parts at Sea-Seligi.
End User: Emerson Process Management
Date: February 2026 – August 2026
Supply and Delivery of Tyco and MEDC devices at Suriname Lot 2.
End User: Petronas Carigali Sdn Bhd
Date: July 2025 – Jun 2027
Provision of Supply, Maintenance and Support of Public Address General Alarm (PAGA) System for SKO.
End User: Hibiscus Oil and Gas Malaysia Limited
Date: November 2025 – November 2028
Provision of Tyco Detector Maintenance Services for PM3 Operation.
End User: Emerson Process Management
Date: December 2025 – June 2026
Supply and Delivery of Tyco and MEDC devices at Suriname Lot 1.
End User: EPOMS Sdn Bhd
Date: November 2025 – June 2026
Supply and Delivery of Tyco Spares for Upgrades at FPSO Berantai.
End User: Petronas Carigali Sdn Bhd
Date: July 2025 – June 2030
Provision of vendor site support services for Tyco Minerva FGSA & Honeywell Gas Detectors at PCSB offshore and onshore locations.
End User: Sarawak Shell Berhad
Date: June 2025 – November 2028
Provision of Personal Gas Monitors, Portable Gas Detectors, Data Storage and Management System.
End User: PTTEP Sarawak Oil Limited / PTTEP Sabah Oil Limited
Date: August 2024 – August 2027
Maintenance and Services of Gas Detection System
End User: Brooke Holding / SSB
Date: August 2024 – January 2025
Supply, Delivery & Documentation of Ultrasonic Gas Leak Detector MSA and Honeywell at F6 VLAP Greenfield Compression Project.
End User: Brooke Holding / SSB
Date: August 2024 – January 2025
Supply, Delivery & Documentation of Fire & Gas Devices Honeywell and associated MEDC and Tyco at F6 VLAP Greenfield Compression Project.
End User: Brooke Holding / SSB
Date: July 2024 – November 2025
Supply, Delivery & Documentation of Fire & Gas Devices Honeywell and associated MEDC, Tyco and SOLO at F6 VLAP Greenfield Pedestal Crane Compression Project.
End User: MLNG
Date: April 2024 – September 2025
Provision of supply, delivery and installation of new Honeywell Optima Plus sample Gas Detector Panel set for Petronas LNG Complex.
End User: MLNG
Date: April 2024 – September 2025
Provision of supply, delivery and installation of new Honeywell Optima Plus sample Gas Detector Panel set for Petronas LNG Complex during Module 7 TA 2024.
End User: Real Sinar / MLNG
Date: April 2024 – September 2025
Supply, Installation, Testing & Commissioning, Delivery and Documentation of Fire & Gas Devices Honeywell, associated MEDC, Malgaz and Swagelok at Glory Train 9.
End User: Petronas Floating LNG 1 (L) Ltd
Date: April 2024 – August 2025
Supply, Installation, Testing & Commissioning, Delivery and Documentation of Vesda Upgrade at Petronas Floating LNG 1
End User: Jx Nippon Oil & Gas Exploration (M) Ltd
Date: March 2024 – March 2026
Price Agreement of Fire and Gas Detectors for supply and maintenance of Honeywell and Tyco Gas at Helang Integrated Platform (HIP).
End User: Ledder / SSB
Date: March 2024 – August 2024
Design, Engineering, Supply, Install, Documentation, Testing & Commissioning of GAI-Tronics Elemec 3 PAGA system and associated MEDC and Weidmuller field devices and accessories at F6LAP Compression Project.
End User: Brooke Holding / SSB
Date: February 2024 – July 2024
Supply, Delivery & Documentation of Fire & Gas Devices Honeywell and associated MEDC, Tyco, MALGAZ, SOLO and KVC at F6VLAP Compression Project.
End User: PTTEP
Date: December 2022 – December 2024
Provision of Gai-Tronics Public Address and General Alarm (PAGA) System Upgrade for PTTEP Sabah Production Operations
End User: MEB Construction Sdn Bhd / Petronas Carigali Sdn Bhd
Date: November 2022 – May 2023
Provision of Procurement, Construction and Commissioning (PCC) of Module 9 and Pipeline for Integrated Bekok Oil Project for supply of Telecom (PAGA).
End User: Petrofac (Malaysia) Limited
Date: November 2022 – June 2023
Provision for PAGA System upgrade at West Desaru
End User: JGC Asia Pacific Pte Ltd / SMDS
Date: November 2022 – June 2023
Supply of SMDS Debottlenecking Phase 2 Project
End User: MLNG
Date: September 2022 – February 2023
Supply and delivery of Honeywell products (Searchline Excel) at MLNG Process 3
End User: HRSB Holdings Sdn Bhd
Date: September 2022 – February 2023
Design, Supply and Delivery of MEDC item at Project Emas, Melaka
End User: Ledder / Sarawak Shell Berhad
Date: August 2022 – December 2022
Design, Supply, Delivery, Install, testing & commissioning of PAGA system at F23.
End User: Ledder / Sarawak Shell Berhad
Date: August 2022 – December 2022
Design, Supply, Delivery, Install, testing & commissioning of PAGA system at F6.
End User: Petronas Carigali Sdn Bhd
Date: June 2022 – June 2025
Provision of vendor site support services for Tyco Minerva FGSA & Honeywell Gas Detectors at PCSB offshore and onshore locations.
End User: MLNG
Date: February 2022 – February 2023
Maintenance & servicing of Fire & Gas Detection System (FGDS) in Petronas LNG complex.
End User: Hibiscus Oil & Gas Malaysia Limited
Date: November 2023 – November 2025
Provision of Gai-Tronics PAGA Parts and Services for PM3
End User: Brooke / SSB
Date: October 2023 – March 2024
Supply, Delivery & Documentation of Fire and Gas Devices (Honeywell) for F6 VLAP Compression project
End User: ABF
Date: October 2023 – October 2026
Maintenance and Services of Gas Detection System for Asean Bintulu Fertilizer Sdn Bhd
End User: Petronas
Date: March 2023 – December 2024
VESDA – High Sensitive Smoke Detection (HSSD) system upgrading work and Site Acceptance Test (SAT)
End User: Sarawak Shell
Date: September 2023 – January 2024
VESDA – High Sensitive Smoke Detection (HSSD) system faults troubleshooting Service and functional test.
End User: OceanMight Sdn Bhd / SSB
Date: June 2023 – December 2023
Supply, Installation, Testing & Commissioning, Delivery and Documentation of Fire and Gas Devices (Honeywell/MEDC) for F22
End User: OceanMight Sdn Bhd / SSB
Date: June 2023 – December 2023
Supply, Installation, Testing & Commissioning, Delivery and Documentation of Fire and Gas Devices (Honeywell/MEDC) for F27
End User: OceanMight Sdn Bhd / SSB
Date: June 2023 – December 2023
Supply, Installation, Testing & Commissioning, Delivery and Documentation of Fire and Gas Devices (Honeywell/MEDC) for Selasih
End User: MLNG
Date: April 2023 – October 2023
Installation of Sampling System Junction Box w/ Optima Plus and OELD
End User: Petronas Carigali Sdn Bhd
Date: April 2023 – April 2026
Price Agreement for Honeywell Sieger Product to Petronas LNG Complex.
End User: SSB/SSPC
Date: March 2023 – March 2028
Price Agreement for the Supply and Delivery of Honeywell Fire & Gas Detectors and Spare Parts
End User: Brooke / SEA HIBISCUS S/B
Date: March 2023 – August 2023
Price Agreement for the Supply and Delivery of Honeywell Fire & Gas Detectors and Spare Parts
End User: PTTEP
Date: January 2023 – January 2024
Provision of New PA System for Sarawak Unmanned Platforms (GOPA, GORA, GOPB, MEPA, BESA, WPPA, WPPB, WPIA, PTSA, PRPA, SEPA & SASA) for PTTEP Sarawak Production Operations
End User: Carigali-PTTEPI Operating Company Sdn Bhd
Date: November 2020 – November 2024
Provision of Maintenance Services Plus Material Supply & Delivery of PAGA System for CPOC Muda.
End User: Repsol Oil & Gas Malaysia Limited
Date: November 2020 – November 2023
Provision of Gai-Tronics PAGA Parts & Services at PM3
End User: Jx Nippon Oil & Gas Exploration (M) Ltd
Date: August 2020 – August 2023
Price Agreement of Fire and Gas Detectors for supply and maintenance of Honeywell and Tyco Gas at Helang Integrated Platform (HIP).
End User: PTTEP
Date: June 2021 – June 2024
Provision of Honeywell Analytic Detectors Maintenance Services and Spare Parts for PTTEP Production Operations.
End User: Carigali Hess Operating Company Sdn Bhd
Date: March 2021 – March 2024
Fire Detection System Maintenance Services at FSO
End User: SSB/PCSB
Date: January 2021 – September 2021
Supply and install of Honeywell Searchzone Sonik Ultrasonic Gas Leak Detector
End User: Petronas Carigali Sdn Bhd
Date: January 2021 – December 2021
Provision of Services and Maintenance for NOVA Public Address & General Alarm (PAGA) system and Associated Equipment at RGTP.
End User: Sarawak Energy
Date: January 2019 – December 2020
Re-Tender for Supply and install Fire Alarm Panel and Detection System.
End User: Sapura / Petronas Carigali
Date: December 2019 – June 2020
Design, Engineering, Supply and Documentation of GAI-Tronics PAGA system and associated MEDC field devices and accessories at Bokor Betty Brownfield and A Rejuvation P2 2020.
End User: Sapura/MMHE
Date: January 2019 – May 2019
Design, Engineering, Supply and Documentation of GAI-Tronics PAGA system and associated MEDC field devices and accessories at BOKOR CPP.
End User: SSB/SSPC
Date: December 2018 – December 2021
Price Agreement for Supply and Delivery of Honeywell Fire and Gas Detectors and Spare parts.
End User: Petronas Carigali Sdn Bhd
Date: October 2018 – September 2021
Price Agreement for Maintenance of Hubbell Gaitronics Public Address and General Alarm (PAGA) at SSGP Bintulu Operation Centre (BOC).
End User: Petronas Carigali Sdn Bhd
Date: October 2018 – August 2021
Provision of vendor site support services for Tyco Minerva FGSA & Honeywell Gas Detectors at PCSB offshore and onshore locations.
End User: Petronas Chemicals Fertiliser Sabah Sdn Bhd
Date: June 2018 – June 2021
Price Agreement for the supply and delivery of MEDC Materials for Petronas Chemicals Fertiliser Sabah Sdn Bhd.
End User: Repsol Oil & Gas Malaysia Limited
Date: November 2018 – November 2020
PA for supply and Services of Gai-Tronics Elemec Plus PAGA System.
End User: Murphy Sarawak Oil Co., Ltd. / Murphy Sabah Oil Co., Ltd
Date: March 2018 – March 2020
Maintenance & Servicing of Honeywell Analytics Detector Maintenance Support Services and Spare Parts for Murphy Production Operations.
End User: Sapura Fabrication Sdn Bhd
Date: November 2018 – March 2019
Supply, Delivery & Documentation of Honeywell Fire Gas Detector and Spares at Gorek.
End User: Leap Networks Pte Ltd, Singapore/Tecnicas Reunidas
Date: July 2018 – December 2018
Design, Engineering, Supply and Documentation of GAI-Tronics Page/Party equipment.
End User: Brooke/Petronas
Date: May 2018 – October 2018
Supply, Delivery & Documentation of Non-Addressable Fire & Gas Devices (MEDC, Honeywell Analytic & Tyco) at Bokor WHP Development.
End User: Petra Resources Sdn Bhd/Petronas Carigali Sdn Bhd
Date: April 2018 – October 2018
Design, Engineering, Supply and Documentation of GAI-Tronics Elemec 3 PAGA system and associated MEDC field devices.
End User: Malaysia LNG Sdn Bhd
Date: August 2018 – September 2018
Fire & Gas Detection & Alarm System, installation of New Gas Detector.
End User: Beumer Maschinenfabrik GmbH & Co. KG/ABF
Date: April 2018 – September 2018
Design, engineering, supply, install, testing and commissioning of Fire Alarm System for rejuvenation of Urea Ship loading facilities project at ABF, Bintulu, Sarawak.
End User: Sarawak Shell Berhad
Date: February 2018 – July 2018
Design, Supply, Delivery, Install, testing & commissioning of E11 GAI-Tronics Elemec 3 PAGA system.
End User: Aisha Trading/Brunei Shell
Date: May 2018 – October 2018
Supply of PA Upgrade to AMPA 6.
End User: MLNG
Date: July 2017 – May 2022
Price Agreement for the supply and delivery of Sieger Products to Petronas LNG Complex (Works).
End User: MLNG
Date: February 2017 – February 2022
Maintenance & servicing of Fire & Gas Detection System (FGDS) in Petronas LNG complex.
End User: MLNG & ABF
Date: December 2017 – December 2020
Price Agreement for the supply and delivery of Hawke Items to MLNG and ABF.
End User: Petronas Carigali Sdn Bhd
Date: November 2017 – November 2020
Contract of servicing safety and firefighting equipment for Petronas Carigali Sdn Bhd Bintulu operation centre.
End User: ABF
Date: July 2017 – July 2020
Maintenance & servicing of Gas Detection System at Asean Bintulu Fertilizer Sdn Bhd.
End User: Carigali Hess
Date: April 2017 – May 2020
Provision of Design, Engineering, Supply, Installation, Testing and Commissioning of GAI-Tronics Elemec 3 PAGA System.
End User: Carigali-PTTEPI Operating Company Sdn Bhd
Date: February 2017 – January 2019
Provision for GAI-Tronics Elemec 3 PAGA system.
End User: Leap Networks Pte Ltd, Singapore
Date: July 2017 – August 2018
Design, Engineering, Supply and Documentation of GAI-Tronics Advance Smart Series PAGA system.
End User: Aisha Trading/Brunei Shell
Date: August 2017 – January 2018
Supply of PA System to AMPA 6.
End User: Repsol Oil & Gas Malaysia Limited
Date: July 2017 – July 2018
PA for supply of Gai-Tronics Advance Smart Series PAGA system.
End User: Brooke/Petronas
Date: December 2017 – June 2018
Supply, Delivery & Documentation of Non-Addressable Fire & Gas Devices (MEDC, Honeywell Analytic & Tyco) at Anjung.
End User: Leap Networks Pte Ltd, Singapore
Date: April 2017 – September 2017
Design, Engineering, Supply and Documentation of GAI-Tronics Advance Smart Series PAGA system.
End User: Leap Networks Pte Ltd, Singapore
Date: March 2017 – August 2017
Supply and Documentation of GAI-Tronics Page Party field devices and acoustic hoods.
End User: Aisha Trading/Brunei Shell
Date: January 2017 – April 2017
Supply, Delivery & Documentation of Non-Addressable Fire & Gas Devices (MEDC, Honeywell Analytic & Tyco) at E6.
End User: Omega/Petronas Carigali
Date: August 2016 – January 2017
Design, Engineering, Supply, Install, Cabling, Documentation, Testing & Commissioning of GAI-Tronics Centra PAGA System.
End User: Aisha Trading/Brunei Shell
Date: September 2016 – February 2017
Supply of PA system to CPWA.
End User: Talisman Malaysia Limited
Date: January 2016 – November 2016
Maintenance Services for GAI-Tronics Plus PAGA system.
End User: HESS
Date: June 2016 – November 2016
Design, Engineering, Supply and Documentation of GAI-Tronics Elemec PAGA system and associated MEDC field devices and accessories.
End User: Samsung
Date: June 2016 – November 2016
Design, Engineering, Supply and Documentation of GAI-Tronics NOVA addressable PAGA system and associated MEDC field devices and accessories.
End User: PT JGC Indonesia/Petronas
Date: January 2016 – June 2016
Design, Engineering, Supply and Documentation of GAI-Tronics Advance Smart Series PAGA system.
End User: Omega/Petronas Carigali
Date: October 2015 – March 2016
Design, Engineering, Supply, Install, Cabling, Documentation, Testing & Commissioning of GAI-Tronics Elemec 3 PAGA system and associated MEDC field devices and accessories.
End User: Leap Networks Pte Ltd, Singapore
Date: September 2015 – December 2015
Design, Engineering, Supply and Documentation of GAI-Tronics Advance Smart Series PAGA system.
End User: Murphy Oil Corp
Date: May 2015 – August 2015
Supply, Delivery & Documentation of Non-Addressable Fire & Gas Devices (MEDC, Honeywell Analytic & Tyco).
End User: Jx Nippon Oil & Gas Exploration (M) Ltd
Date: Jan 2015 – June 2015
Design, Engineering, Supply and Documentation of GAI-Tronics Paga/Party System and associated field devices and accessories.
End User: Petronas Carigali Sdn Bhd
Date: September 2014 – July 2016
Maintenance Service for GAI-Tronics Elemec Plus PAGA System.
End User: Shell MDS (Malaysia) Sdn Bhd
Date: November 2014 – June 2015
Supply, Delivery & Documentation of Non-Addressable Fire & Gas Devices Honeywell Analytic.
End User: SSPC/Technip MMHE JV
Date: September 2014 – March 2015
Design, Engineering, Supply and Documentation of GAI-Tronics Elemec Plus PAGA system and associated MEDC field devices and accessories.
End User: Petronas Carigali Sdn Bhd
Date: August 2014 – January 2015
Design, Engineering, Supply, Install, Cabling, Documentation, Testing & Commissioning of GAI-Tronics Centra Page PAGA System.
End User: Jx Nippon Oil & Gas Exploration (M) Ltd
Date: August 2014 – December 2014
Supply, Delivery & Documentation of Minerva FGSA Upgrading Services.
End User: Aisha Trading/Brunei Shell
Date: January 2014 – June 2014
Supply of PA system to Brunei Shell at Champion 7.
End User: Aisha Trading/Brunei Shell Refinery
Date: November 2014 – April 2015
Supply of PA system to Brunei Shell Refinery.
End User: Carigali Hess
Date: August 2013 – March 2014
Design, Engineering, Supply, Install, Cabling, Documentation, Testing & Commissioning of GAI-Tronics Elemec Plus PAGA system and associated MEDC field devices and accessories.
End User: Murphy Oil Corp
Date: October 2013 – December 2013
Supply, Delivery & Documentation of Non-Addressable Fire & Gas Devices (MEDC, Honeywell Analytic & Tyco).
End User: ExxonMobil Exploration and Production Malaysia Inc.
Date: October 2013 – December 2013
Supply, Delivery & Documentation of Honeywell Flame Detector.
End User: Petronas Carigali Sdn Bhd
Date: July 2013 – December 2013
Maintenance Service for GAI-Tronics Elemec Plus PAGA system.
End User: Murphy Oil Corp
Date: March 2013 – May 2013
Supply, Delivery & Documentation of Remote Control Unit & Safety Switch (RCU).
End User: Malaysia LNG Sdn Bhd
Date: February 2013 – May 2013
Supply, Install, testing and Commissioning of Flame Detector.
End User: Sarawak Shell Berhad
Date: December 2012 – May 2013
Design and Supply, testing & commissioning to replacement of the Addressable Fire Alarm Systems at M01, M02, and B11 for the Technical Integrity Fix (Ti-Fix) and Integrity Restoration (IR) Project.
End User: Murphy Oil Corp
Date: December 2012 – March 2013
Supply, Delivery & Documentation of Non-Addressable Fire & Gas Devices (MEDC, Honeywell Analytic, Tyco & VESDA).
End User: Sarawak Shell Berhad
Date: December 2012 – January 2013
Supply, Delivery, Documentation of MEDC Manual Call Points and Sounders.
End User: Asean Bintulu Fertilizer
Date: December 2012 – January 2013
Upgrading of existing ABF Addressable Fire Alarm Fire System.
End User: Malaysia LNG Sdn Bhd
Date: September 2012 – November 2012
Supply, Install, testing and Commissioning of MEDC Sounders, beacons and Manual Call Points.
End User: Sarawak Shell Berhad
Date: July 2012 – January 2013
Design and Supply, Installation, Testing & Commissioning of General Platform Alarm (GPA).
End User: Sarawak Shell Berhad / Sabah Shell Petroleum Company
Date: June 2012 – June 2013
Design and Supply, Installation, Testing & Commissioning to replacement of the Addressable Fire Alarm Systems.
End User: Sarawak Shell Berhad
Date: April 2012 – September 2012
Design and Supply, Testing and Commissioning of GAI-Tronics Elemec Plus PAGA System.
End User: ExxonMobil Exploration and Production Malaysia Inc.
Date: April 2012 – June 2012
Supply, Testing and Commissioning of Gas Detection Equipment.
End User: Petronas Dagangan Sdn Bhd
Date: August 2011 – March 2012
Design, Engineering, Supply, Documentation, Testing and Commissioning of GAI-Tronics Advance Smart Series PAGA system c/w associates field devices and accessories.
End User: Petronas Carigali Sdn Bhd
Date: October 2011 – February 2012
Design, Engineering, Supply, Install, Cabling, Documentation, Testing & Commissioning of GAI-Tronics Elemec Plus PAGA system and associated MEDC field devices and accessories.
End User: ExxonMobil Exploration and Production Malaysia Inc.
Date: September 2011 – February 2012
Design, Engineering, Supply, Documentation, testing and Commissioning of GAI-Tronics Advance Smart Series PAGA system, inclusive of Page/Party System. Tie-in with existing system at TaA, TaB, TaC and TaD.
End User: Sabah Shell Petroleum Company
Date: September 2011 – February 2012
Design and Supply, Testing and Commissioning of GAI-Tronics Elemec Plus PAGA System.
End User: Shell Refining Company Berhad
Date: October 2011 – December 2011
Supply, Delivery, Documentation of MEDC Manual Call Points, Beacons and Sounders.
End User: Murphy Oil Corp
Date: June 2011 – September 2011
Supply of Electrical Junction Boxes (Hawke) and Victor Lighting Fixtures.
End User: Sarawak Shell Berhad
Date: April 2011 – August 2011
Design and Supply, testing & commissioning of GAI-Tronics Elemec Plus PAGA system.
End User: Sabah Shell Petroleum Company
Date: January 2010 – June 2010
Supply, testing and commissioning of Addressable Fire Alarm Panel and Field Devices at St Joseph Platform.
End User: ExxonMobil Exploration and Production Malaysia Inc.
Date: January 2010 – June 2010
Lawit A Compressor Restage and TCP Upgrade Project Supply and deliver of GAI-Tronics Page/Party System.
End User: Sabah Shell Petroleum Company
Date: February 2010 – May 2010
Supply of Honeywell Analytics Point Infra Red and Open Path Gas Detectors.
End User: PFC Engineering Sdn Bhd
Date: July 2009 – December 2009
Design, Engineering, Supply and Commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC field devices.
End User: Petronas Carigali Sdn Bhd
Date: February 2009 – July 2009
Supply and Delivery of Fire and Gas Detector and Manual Break Glass Stations at D30, WHSF and D35 Cluster Development Project.
End User: Petronas Carigali Sdn Bhd
Date: February 2009 – July 2009
Design, Engineering, Supply, Testing and Commissioning of GAI-Tronics NOVA addressable PAGA system and associated MEDC field devices.
End User: Sarawak Shell Berhad
Date: January 2009 – June 2009
Design, Engineering, Supply and Commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC field devices.
End User: Asean Bintulu Fertilizer
Date: January 2009 – June 2009
Engineering, supply, test and commission of Tyco addressable devices at Bintulu Port and tie-in to existing addressable system at ABF.
End User: Sarawak Shell Berhad
Date: July 2008 – October 2009
Supply of Honeywell Analytics Gas Detector, Open Path IR, H2S & H2 Gas Detector.
End User: Sarawak Shell Berhad
Date: August 2008 – January 2009
Design, engineering, supply & commissioning of GAI-Tronics Elemec Plus PAGA system and associated MEDC field devices for B11K-A Topsides.
End User: Malaysia LNG Sdn Bhd
Date: October 2008 – December 2008
Supply of Honeywell Analytics Optima Plus at MLNG Plant.
End User: Malaysia LNG Sdn Bhd
Date: September 2008 – December 2008
Supply, Upgrade, Engineering, Installation, testing and commissioning of Honeywell Analytics Open Path IR Gas Detector.
End User: Petronas Carigali (Turkmenistan) Sdn Bhd
Date: May 2008 – July 2008
Supply of MEDC MCP Station.
End User: Sarawak Shell Berhad
Date: October 2007 – March 2008
Modification of GAI-Tronics Elemec Plus PAGA system.
End User: Sarawak Shell Berhad
Date: September 2007 – March 2008
Modification of existing F6 PA/GPA/PAPA system to include new F6 LQ. Supply of new field devices, additional amplifiers, software and hardware modification of GAI-Tronics Centra Page PAGA system.
End User: Sarawak Shell Berhad
Date: August 2007 – March 2008
Design, engineering, supply, testing and commissioning of new Fire Alarm Addressable System and devices at F6 and F23 LQ.
End User: Petronas Carigali Sdn Bhd
Date: May 2007 – October 2007
Design, engineering, supply & commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC fields devices.
End User: Newfield Peninsular Inc.
Date: February 2007 – July 2007
Design, engineering, supply & commissioning of Gai-Tronics Elemect Plus PAGA system and associated fields devices.
End User: Sarawak Shell Berhad
Date: January 2007 – June 2007
Design, engineering, supply & commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC fields devices.
End User: Sarawak Shell Berhad
Date: December 2006 – June 2007
Design, engineering, supply & commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC fields devices.
End User: Petronas Carigali Sdn Bhd
Date: October 2006 – April 2007
Design, engineering, supply install, testing & commissioning of TMR Fire and Gas system to replace the existing system at Temana A Platform. Inclusive of Field Devices.
End User: Petronas Carigali Sdn Bhd - Sarawak Operations
Date: January 2006 – January 2007
Design, engineering, supply, Testing and Offshore Commissioning and Start-Up of GAI-Tronics Page/Party System with its associated GPA Speakers, beacon and breakglass station for Baram Platform, Miri Sarawak.
End User: Sarawak Shell Berhad
Date: July 2006 – October 2006
Design, engineering, supply, testing and commissioning of new Fire Alarm Addressable System and devices at F6 and F23 LQ.
End User: Murphy Oil Corp
Date: January 2006 – August 2006
Supply, Install, testing and commissioning new extension of GAI-Tronics Page/Party System.
End User: Petronas Carigali Sdn Bhd - Sarawak Operations
Date: March 2006 – August 2006
Design, engineering, supply modify, install, test and commission a new GAI-Tronics Elemec Plus PAGA system.
End User: Sarawak Shell Berhad
Date: December 2005 – May 2006
Design, engineering, supply & commissioning of Gai-Tronics Elemec Plus PAGA system and associated field devices for F23 Rejuvenation project.
End User: Sarawak Shell Berhad
Date: August 2005 – October 2005
Design, Engineering, Supply and Commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC fields devices.
End User: Malaysia LNG Sdn Bhd
Date: July 2005 – July 2005
Supply, Install and Commissioning Siren Controller and associated field devices.
End User: Sarawak Shell Berhad
Date: March 2005 – July 2005
Design, Engineering, Supply and Commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC fields devices.
End User: Malaysia LNG Sdn Bhd
Date: July 2005 – July 2005
Upgrading of Honeywell Analytics System 57 gas control racks at module 4,5 & 6 at MLNG.
End User: Sarawak Shell Berhad
Date: July 2004 – August 2005
Repair and Restoration of NEC PAGA System including spares at F6.
End User: Sarawak Shell Berhad
Date: June 2004 – November 2004
Design, Engineering, Supply and Commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC fields devices.
End User: Sarawak Shell Berhad
Date: December 2003 – October 2004
Design, engineering, supply & commissioning of GAI-Tronics Elemec Plus PAGA system and associated MEDC fields devices for E11 Rejuvenation Project.
End User: Sabah Shell Petroleum Company
Date: January 2004 – September 2004
Design, Engineering, Supply, Testing, Commissioning & Start-Up of GAI-Tronics Elemec Plus PAGA system and associated MEDC field devices.
End User: Sarawak Shell Berhad
Date: March 2004 – July 2004
Design, Engineering, Supply and Commissioning of Gai-Tronics Elemec Plus PAGA system and associated MEDC fields devices.
End User: Petronas Carigali Sdn Bhd
Date: March 2004 – June 2004
Upgrade GAI-Tronics Page/Party System.